Case Study
Basic Engineering Package (BEP) and +/-20% estimate
— OIL AND GAS CASE STUDY - ENSUS UK LTD, TEESSIDE, UK Basic Engineering Package (BEP) and +/-20% estimate ABB helps client select project options quickly and effectively with +/-20% estimates supported by a BEP. Ensus UK Ltd were considering uprating the evaporation section of their bioethanol plant at Wilton, Teesside, to improve plant efficiency and had identified two possible options. Ensus recognised ABB’s strengths and proven experience on front end project definition. Ensus selected ABB to develop ±20% Total Installed Cost (TIC) estimates for the two options to enable Ensus to ascertain which, from an economic perspective, offered the best solution. Based on the estimates Ensus were then able to determine whether the project was economically viable and select a prefe