Case Study

Ballarat Goldfields

Ballarat Goldfields

Pages 2 Pages

Ballarat Goldfields Installation of Modular Gold Plant Gekko Systems have recently designed, engineered and built the Stage 1 process plant for Ballarat Goldfields (BGF). The plant currently has a capacity of 600,000 tonnes per annum (tpa) with the ability to increase production significantly beyond that on completion of Stage 2. The plant started commissioning in December 2005 and achieved the target of a first gold pour prior

Join for free to read