Case Study
BAE Systems, UK
The light weight scissor bridge designed by Vickers Bridging is dependant for its operation on the central pair of launch ties. After extensive field and test laboratory trials PARAFIL® has replaced the original steel bar ties offering a considerable weight saving. The bridge system, equipped with 60 Tonne TYPE:G PARAFIL® ties first entered operational service in the mid 1990’s and is still used today almost twenty years later on the Titan Armour