Case Study

Gatwick, UK

Gatwick, UK

PROBLEM Investment in Gatwick Airport was required to increase flexibility for aircraft operators and to accommodate the new Airbus A380 aircraft, soon to be joining fleets around the world. 100,000m 2 of new aircraft stands and taxiways were to be constructed to the north-western side of the airport. The airport’s nearest neighbours would be able to see the tail- fins of the A380 as the existing visual and acoustic bund at Gatwick airport stands

Join for free to read