Case Study

Bad Hersfeld

Bad Hersfeld

Germany | Bad Hersfeld BAD HERSFELDREFBADHERSFELD-AEN113710 Printed on chlorine-free paper. SMA Solar Technology AG Maximum reliability with SUNNY TRIPOWER 17000TL Located in Bad Hersfeld, in central Germany, the first large-scale plant with three-phase SMA Sunny Tripower 17000 TL inverters is connected to the grid. Since June 2010, a total of 30 inverters have been converting the direct current generated in the 7,930 modules from First Sol

Join for free to read