Case Study
Automotive Assembly Plant
The Dynatec Difference Automotive Assembly Plant Wastewater for Reuse Ford Motor company installed a membrane bioreactor (MBR) followed by a Reverse Osmosis System to process treated wastewater for reuse in the plant. The wastewater that is purified for reuse is reused in the cooling towers and on the paint line. The system is designed to process 400,000 gallons per day. Approximately 70% of that water is purified for reuse in the p