Case Study

Aston House .

Aston House .

Pages 1 Pages

CASE STUDY CLIENT Titan Property Developments Ltd LOCATION Gerrards Cross VALUE £5.5M DATE November 2018 March 2020 About the project. This development involves the demolition of an existing four-storey office building followed by the construction of a new five-storey residential block containing 32 apartments. The building has piled foundations and a RC concrete structure up to the first-floor transfer deck, thereafter the structure is of met frame construction with composite concrete floors. The external envelope has a brick-work skin restrained back to the met frame up to the fifth-floor which has metal rain screen cladding panels. The envelope is completed with aluminium windows, feature doors and a section of rain screen cladding on the ground floo

Join for free to read