Case Study
Asphaltene Control Program Results in $1 Million Savings
TRUE SUCCESSES PureChem Services Head Office 1400, 700 4 th Avenue SW Calgary, AB T2P 3J4 403.269.2800 PureChem Services Production Facility Hwy 9 South, Box 1089 Carlyle, SK SOC 0R0 306.453.4414 PureChem Services Blend Plant 1302 5th Street Nisku, AB T9E 7R6 780.955.3596 For a full list of locations and contact information please visit us at; www.purechemservices.com TS-2018.023 AC Asphaltene Control Program Results in $1 Million Savings Challenge A producer in northern Alberta was experiencing significant asphaltene issues at their plant resulting in a high volume of compressor valve replacements, at times as high as 29 valve changes per day. This was contributing to higher equipment and operator costs as well as safety concer