Ashby Canal Dredge 2014
ASHBY CANAL DREDGE 2014 A s h b y C a n a l D r e d g e 2 0 1 4 Project Information ? CANAL AND RIVER TRUST ? DREDGING AND NICOSPAN ? VALUE: £175,000 ? JULY —AUGUST 2014 Whilst on site additional spot dredging was added to the scheme at three locations upstream on the canal. In order to provide suitable areas for disposal of the silt dredged from these areas, a section of Nicospan was installed at the winding hole at Shenton.