Case Study
Asbestos Removal
Project Title Value Programme Duration Nature Client Oceanic House £800,000.00 52 Weeks Asbestos Removal FB Ellmer Ltd About The Project FB Ellmer secured the refurbishment of this prestigious grade 2 listed building located on Trafalgar Square. The building had been subject to various asbestos abatement programmes over the years but due to the extent of the refurbishment planned it would be necessary to try and remove all remaining asbestos, much of which was structure borne. The asbestos was present within the clinker throughout the building and it was necessary for Decontaminate to work closely with Deconstruct and remove entire floors and walls along with pockets from within the masonry. The work had to be undertaken meticulously to ensure that the structural stability of the