Case Study
Arbor Square
Arbor Square Olympia / WA Arbor Square was suffering from leaks on average every two weeks. SageWater replaced the defective polybutylene domestic water supply pipes with CPVC piping in 80 one-bath units and 55 two-bath units as well as the community clubhouse. From an investment perspective, the owners are enthusiastic about eliminating the steep costs associated with persistent leaks and residents now have the peace of mind in knowing that their homes and belongings are protected from future damage and disruption. Polybutylene - Interior Supply , Supply Piping Units : 135 Stories : 2 Built : 1989 Duration : 3 months Problem : Failing polybutylene piping Solution : Replacement of the domestic water supply system © 2018 Phoenix Renovation Corp., d.b.a., SageWater. All rights reserved. One