Amersham Signal Equipment Room

Amersham Signal Equipment Room

Pages 1 Pages

“Compound setup, CFA, piling, pile caps, steel erection and drainage” Amersham Signal Equipment Room Amersham Signal Equipment Room Steel work erection T he construction of an SER base at Amersham as part of the London Underground/ TFL 4 Line Modernisation scheme in North West London. Project Deliverables Pod-Trak undertook the construction of all civils aspects of the project; this included a temporary piling mat, 15 no. CFA piles and pile caps, embankment stairs, the installation of a prefabricated steel frame and walkway and all associated drainage. Pod-Trak also carried out all preparation work for SSE including tree protection, haulage roads and setting up of the site compound. Challenges and Solutions Restrictions with space on site and its proximity to the