CASE STUDY NHS PROPERTY SERVICES MOVES FROM COMPLEX MIX OF SUPPLIERS TO ONE SERVICE PARTNER THE CLIENT BRIEF A pharmaceutical client with bespoke critical power equipment needed their G59 upgrading to G99 relays on 6 main generators, to meet the requirements of the Accelerated Loss of Mains (LoM) Change Programme. These changes were necessary to ensure that in the event of a loss of power from the mains, or any move out of tolerance, the switch to the back-up generators would be both quick and trouble free. WHY WE’RE THE PERFECT PARTNER • The upgraded links would affect the control system of their 6 main bespoke generators and therefore Dale Power Solutions engineers were asked to provide a support role to the internal engineering team PROJECT DELIVERY • Dale Power Sol