Alltask were commissioned by McNicholas to design, erect and dismantle a scaffold to provide a weather protection enclosure at Ninfield Substation

Alltask were commissioned by McNicholas to design, erect and dismantle a scaffold to provide a weather protection enclosure at Ninfield Substation

Pages 2 Pages

Alltask Limited Alltask House, Commissioners Road Rochester, Kent ME2 4EJ 01634 298000 enquiries@alltask.co.uk www.alltask.co.uk Scaffolding Asbestos Insulation CLIENT Project Particulars: Alltask were commissioned by McNicholas to design, erect and dismantle a scaffold to provide a weather protection enclosure at Ninfi eld Substation, The scheme was developed by our in-house design team to incorporate six new 132kV sealing end structures and included a NIKO runway beam to lift the new equipment into place installed and tested by Alltask trained operatives. The structure was constructed from HAKI system scaffold with multiple decked levels to provide access for the cable jointing works and sealing end installation The structure was then fully encapsulated with shrink-wrap sheeti

Join for free to read