Case Study

Air Quality-EfW

Air Quality-EfW

Pages 1 Pages

The Airshed Ltd 5 Lauder Place, East Linton EH40 3DB. Tel. 01620 860 529 email mail@theairshed.com The Airshed Case Study No 54 Air Quality EfW This application proposed constructing a new energy from waste (EfW) process using 240,000 tonnes per annum of processed residual munici- pal and commercial solid waste material as fuel. The main process build- ing was 27m high and housed the combustion plant, heat exchange boil- ers and steam

Join for free to read