Case Study

Abrado Liner Top Test Packer - 2014 |

Abrado Liner Top Test Packer - 2014 |

SEE THE DIFFERENCE WWW.ABRADO-INTL.COM | 24 HOUR GLOBAL RESPONSE: 1.855.DVD WELL (1.855.383.9355) ® SEE THE DIFFERENCE ® ® ® SEE THE DIFFERENCE ® ® Abrado Liner Top Test Packer - 2014 | CASE HISTORY OPERATOR: Energen Resources REGION: Land—Permian Basin SERVICE: Abrado’s Liner Top Test Packer (LTTP) was requested for a Liner Top Test after cementing a 4 1/2” Liner on a well on a land well in the Permian Basin. • (1) 7” Liner Top Test Packer

Join for free to read