Case Study

Abrado Displacement / Liner Top Test Gulf of Mexico Offshore 2015 |

Abrado Displacement / Liner Top Test Gulf of Mexico Offshore 2015 |

SEE THE DIFFERENCE WWW.ABRADO-INTL.COM | 24 HOUR GLOBAL RESPONSE: 1.855.DVD WELL (1.855.383.9355) ® SEE THE DIFFERENCE ® ® ® SEE THE DIFFERENCE ® ® Abrado Displacement / Liner Top Test Gulf of Mexico Offshore 2015 | CASE HISTORY Operator: Enven Region: Shelf—Gulf of Mexico Service: Abrado’s Liner Top Test Packer (LTTP) was requested for a Liner Top Test after a drill out on a well in the GOM. • (1) 7 5/8” Liner Top Test Packer (LTTP) • (2) 7

Join for free to read