Case Study

ABI Equipment Limited was asked to supply specialist equipment consisting of an ABI TM 13/16 Mobilram complete with MRZV925VS variable moment vibrator

ABI Equipment Limited was asked to supply specialist equipment consisting of an ABI TM 13/16 Mobilram complete with MRZV925VS variable moment vibrator

Main Contractor Balfour Beatty was awarded the contract for the Aurura Hotel Development at the location of the O2 arena. The contract involved driving 350 x 350 mms by up to 14 metres long pre cast concrete piles. They decided that prior to carrying out the piling work, to probe the ground first to ensure that the ground was free from any obstructions. Main Contractor: Balfour Beatty Ground Engineering Piling Equipment supplier: ABI Equipment Limited ABI Equipment Limited was asked to supply specialist equipment consisting of an ABI TM 13/16 Mobilram complete with MRZV925VS variable moment vibrator for ground probing by contractor Balfour Beatty Ground Engineering. This would be used for ‘spiking’ the