Case Study

ABI Equipment Limited was asked to supply specialist equipment consisting of an ABI Mobilram TM 13/16SL complete with the MRZV17VV variable moment vib

ABI Equipment Limited was asked to supply specialist equipment consisting of an ABI Mobilram TM 13/16SL complete with the MRZV17VV variable moment vib

The work consisted of driving 12 metre long 600mm wide Arcelor PU 22-1 and PU 18-1 steel sheet piles alongside the busy M6 motorway, forming a series of retaining walls. The ground conditions were granular overlying cobbles and stiff clay. The ABI TM 13/16SL Mobilram c/w MRZV17VV variable moment vibrator was particularly effective at driving the 12 metre long piles with minimum vibration. On occasions it was necessary to use the ABI MDBA auger drive and open flighted CFA augers to “stress relieve” the ground ahead of pile installation. Where oversized boulders were uncounted, they were dug out in advance of the piling. The compact nature of the rig was ideally suited to working alongside the motorway where space was limited between the work area and the s

Join for free to read