ABI Equipment Limited was asked to supply specialist equipment consisting of a Delmag RH28 drilling rig, complete with rotary head and Kelly bar by

ABI Equipment Limited was asked to supply specialist equipment consisting of a Delmag RH28 drilling rig, complete with rotary head and Kelly bar by

ABI Equipment Limited was asked to supply specialist equipment consisting of a Delmag RH28 drilling rig, complete with rotary head and Kelly bar by piling contractor Fugro Geoservices. The piling works for the jetty were carried out between November 2016 and May 2017. The Project Main contractor Costain and piling contractor Fugro Geoservices used a unique ‘walking’ jack-up barge to construct the 490m long jetty in the Bristol Channel. The jetty will be used to import aggregate for the construction of the £18bn Hinkley Point Power Station. The aggregate is for the four Jetty for Hinkley Point C Power Station Main Contractor: Costain Client: EDF Energy Piling contractor: Fugro Geoservices Piling Equipment supplier: