ABI Equipment Limited was asked to supply specialist equipment consisting of a Delmag RH34 drilling rig, with extended reach capability and drilling tools by piling sub-contractor Bachy Solentanche. The piling works were carried out over a four month period between September and December 2017. Water Street Bridge, Canary Wharf Main Contractor: Red7Marine Client: Canary Wharf Contractors Piling Sub contractor: Bachy Solentanche Piling Equipment supplier: ABI Equipment Limited The Project The Water Street Bridge project is part of the Canary Wharf Masterplan that involves the construction of a new district on the site of Wood Wharf. Designed by Allies and Morrison Architects the new district is expected to be completed in 2023 and will provide 3,300 new homes