Case Study

Aberthaw Power Station Biomass Co-Firing System

Aberthaw Power Station Biomass Co-Firing System

Aberthaw Power Station Biomass Co-Firing System Saxlund was awarded the contract to automate the biomass co-firing pilot plant at Aberthaw Power Station. The system makes use of an existing building and consists of a Push Floor flat floor bunker area which is loaded from delivery trucks and maintained full by a wheeled loader machine. The Push Floor discharges on demand and at a controlled rate, across a disc screen via a series of chain

Join for free to read