Case Study
300MW biomass co-firing plant adopts Halifax Fans
case study Halifax Fan blower for hazardous gas application case study 16 Ferrybridge ‘C’ showing ‘Bioswirl’ biomass fuel units In order to increase its biomass burning capacity, SSE has commissioned TPS to build six new ‘BioSwirl’ biomass burner systems on each of two boilers. These, when commissioned, will effectively supply 10% of the total energy of the 500MW electrical capacity of each boiler, substituting carbon neutral biomass fu