Case Study
Abbey Primary School, Mansfield
Abbey Primary School, Mansfield. Abbey Primary School in Mans eld required two separate areas of playground equipment for di erent age groups, and therefore di erent abilities of pupils. The school decided to use Hand Made Places for both areas so that the school’s equipment showed cohesion. The areas, though somewhat di erent, did have similarities, meaning that as children move up the school there will be a consistency to their play apparatus.Both areas had trim trails installed, however Hand Made Places worked with the school to ensure that the di erent trim trails suited the age group and ability of those pupils that it was targeted towards. KS1 Playground Equipment. The key stage one equipment which was installed included a trim trail which was both challenging and exciting for