Case Study

A wastewater facility upgrade designed for phosphorus removal and affordability

A wastewater facility upgrade designed for phosphorus removal and affordability

Pages 3 Pages

5 Burks Way · Winnipeg MB · R2J 3R8 888·426·8180 • www.nexom.com A wastewater facility upgrade designed for phosphorus removal and affordability Project Type: Municipal Wastewater Treatment Completion Date: February 2012 Treatment Objectives: Design flow: 2.89 MGD average 11.62 MGD peak Required Effluent Quality: May-Oct TP: 0.07 mg/L Nov-Apr TP: 1.0 mg/L Project Background and Challenges CASE STUDY : MALBOROUGH, MASSACHUSETTS The city of Malborough, Massachusetts consists of approximately 40,000 people located in Middlesex County, about 32 miles from Boston. Initially settled as a town in 1660, it became a favored stop on the Post Road as populations, business and travel grew in the colonies. By 1890, Marlborough was a major shoe manufacturing center, producing boots for Union

Join for free to read