Case Study

Phosphorus Removal Achieved with Capital Affordability

Phosphorus Removal Achieved with Capital Affordability

System Design The single-stage Blue PRO ® system features three CF-64 cells installed in concrete. Concrete for a fourth cell was installed for future lifecycle needs of the facility. With the system operating at 8,500 feet in elevation, the filters were enclosed in a building for freeze protection. TECHNOLOGIES BLUE WATER Phosphorus Removal Achieved with Capital Affordability BACKGROUND Phosphorus Removal The Blue PRO ® system was chosen f

Join for free to read