A Major Iron Ore Miner Eliminated 5 Out Of 6 Confined Space Events Per Chute By Changing To Laminite Wear Liners Within A Ship Loading Facility

A Major Iron Ore Miner Eliminated 5 Out Of 6 Confined Space Events Per Chute By Changing To Laminite Wear Liners Within A Ship Loading Facility

Pages 1 Pages

• Replace Bisalloy with Laminite ® W ear liners. • Laminite ® Wear liners lasted 10 months. • Plant down time for wear plate change out is now 2 days per annum. OUR SOLUTION CHALLENGES THEY WERE FACING LAMINITE ® WEAR LINERS VS BISALLOY 500 A MAJOR IRON ORE MINER ELIMINATED 5 OUT OF 6 CONFINED SPACE EVENTS PER CHUTE BY CHANGING TO LAMINITE ® WEAR LINERS WITHIN A SHIP LOADING FACILITY • Maintenance costs and downtime - wear plate change out is 12 days per annum - Bisalloy plates only lasting 2 months. • Eliminate confined space work. • Reduce maintenance on ship loading transfer chute. Bisalloy 500 Wear life 2 months Maintenance Change outs 12 days Laminite ® Wear Liners Wear Life 10 Months Wear Life % Comparison $28, 000 Tonnage 3746 trucks at 110/train trucks Total Tonnage

Join for free to read