Case Study
A leading Building Society wanted to replace a Riello UPS which supported their head office server room.
A leading Building Society wanted to replace a Riello UPS which supported their head office server room.
CASE STUDY NHS PROPERTY SERVICES MOVES FROM COMPLEX MIX OF SUPPLIERS TO ONE SERVICE PARTNER THE CLIENT BRIEF A leading Building Society wanted to replace a Riello UPS which supported their head office server room. Space was limited but the client needed a battery which would provide sufficient time to shut down computer equipment safely during a power outage. WHY WE’RE THE PERFECT PARTNER • The E73330B has an internal battery with a 12- minute run time on kVA full load • All parts are contained within the cabinet, including the internal battery and therefore footprint is kept minimal • The E700 series has been designed for quick and easy installation. An existing bypass system was used to isolate the supply ensuring business could continue as usual during installation PROJEC