Case Study
Large public sector authority choses flexible, modular design UPS
CASE STUDY BATTERY REPLACEMENT FOR OIL AND GAS CLIENT MINIMISES OFFSHORE MAINTENANCE THE CLIENT BRIEF Our client, a large public sector local authority in London, had a closed loop protocol UPS system. When they came to renew the servicing and maintenance contract, they realised that the closed protocol system locked them into an extremely expensive servicing and maintenance contract with their existing supplier. WHY WE’RE THE PERFECT PARTNER • Flexibility and control were core to the delivery when considering not only servicing package but also the product • The Dale E600 allowed the client to configure loads from 20-600kVA as well as having power autonomy that could be added to suit their requirements • The sophisticated design of the UPS system enables maintenance work