Case Study

A BI Mobilram fitted with the latest generation vibrato r gives BAM-Nuttall the edge at RNLI All-weather Lifeboat Centre construction in Poole Harbour

A BI Mobilram fitted with the latest generation vibrato r gives BAM-Nuttall the edge at RNLI All-weather Lifeboat Centre construction in Poole Harbour

Buildings to be demolished Site boundary The steel sheet piles, weighing around 3,000kg, were to be supplied and installed in crimped pairs. The site investigation showed the ground to consist primarily of silts, sands and gravels but also highlighted the presence of very stiff layers of clay (N = 45/50 blows) within 2m of proposed toe level. ABI Mobilram fitted with the latest generation vibrator gives BAM-Nuttall the edge at RNLI All-weather Lifeboat Centre construction in Poole Harbour, England. BAM-Nuttall was recently awarded a contract to redevelop a facility for RNLI at the charity’s headquarters in Poole on the south coast of England. Works involved the demolition of the existing buildings and installation of a new q