Case Study
860 Potomac
860 Potomac Office Building Case Study The Solution In partnership with Lever, the building owner was able to utilize C -PACE to finance energy efficiency solutions, capital expenditures, and tenant improvements including advanced building controls and high efficiency HVAC systems. At no out of pocket costs to the owner, these investments improved the asset quality, significantly reduced operating expenses, and improved the comfort of the building for tenants. The end result was a more competitive real estate asset with improved net operating income. The Challenge 860 Potomac, an existing Class B medical office building located adjacent to Colorado’s Fitzsimons Medical Campus, needed significant building system upgrades to bring the property to market and attract a new tenant ba