Case Study

8 blocks of 28 modules L1B35 - 55 m² 55,0

8 blocks of 28 modules L1B35 - 55 m² 55,0

8 blocks of 28 modules L1B35-55 m² 55,000 m 3 /day Raw water origin : surface HEADWORKS BIOLOGY SEPARATION MEMBRANE DISINFECTION BIOSOLIDS SYSTEMS CASE STUDY VIGNEUX, France (91) Eco-Friendly Safe Economical Energy EfficientWater is mostly taken from the Seine and then processed in three plants: Vigneux sur Seine, the most innovative, Morsang sur Seine, and Viry Châtillon. The Vigneux treatment plant is thus the link in a chain entirely dedic