Case Study

7 blocks of 48 modules L1B35 - 55 m² 35,0

7 blocks of 48 modules L1B35 - 55 m² 35,0

7 blocks of 48 modules L1B35-55 m² 35,000 m 3 /day Raw water origin : surface HEADWORKS BIOLOGY SEPARATION MEMBRANE DISINFECTION BIOSOLIDS SYSTEMS CASE STUDY SAN ANTONIO, USA (Texas) Eco-Friendly Safe Economical Energy EfficientThe Bexar plant was the first DBO (Design, Build, Operate) in the United States. The source of this unit is the Medina river, the water of which is treated to produce tasteless and odorless drinking water. It supplies

Join for free to read