Case Study

741 ACE Screener At East Bergholt

741 ACE Screener At East Bergholt

Sheet 19 - 18/05/2010 CASE STUDY 741 ACE Screener at East Bergholt STW February 2010 SPECIFICATION A 741 Ace Screener mounted in a prefabricated inlet complete with hand rake bypass screen, 302 Ace Pump, LS305-4VR(S) and Allen Bradley Touch Screen Control Panel SITE INFORMATION The flow is fed to the site from three pumping stations into a central manhole. The

Join for free to read