Case Study

491 ACE Screener At Carno

491 ACE Screener At Carno

CASE STUDY 491 ACE Screener at Carno STW June 2010 SPECIFICATION A 491 Ace Screener with lowered toe mounted in a prefabricated inlet box complete with Grit box mounted on the upstream side of the Screener, 302 Ace Pump, LS305-4VR Lipactor Station discharging into a Carriskip and Touch Screen Control Panel SITE INFORMATION The Haigh 491 ACE Screener was chosen for this small rural site to ensure that the both the low

Join for free to read