Case Study
590 ACE Screener At Abbotsbury
Rev 1 - 23/10/2009 CASE STUDY 590 ACE Screener at Abbotsbury STW JUNE 2009 SPECIFICATION A 590 ACE Screener (V2) mounted in a prefabricated inlet complete with a series 2 152 Ace Pump, LS305-4VR(S) Lipactor Station and Mitsubishi Touch Screen Control Panel INSTALLATION The 590 ACE Screener prefabricated inlet is positioned on a flat concrete plinth and piped