50% Relative Humidity & 50% Savings

50% Relative Humidity & 50% Savings

Pages 4 Pages

Allegra Print & Imaging-Tulsa moved its operations into an ex- isting facility with 6,000 ft 2 of production space and 4,000 ft 2 of office space. The heating and cooling system for the facility con- sisted of a single multi-zone unit system, installed in 1962 when the facility was built. Multi-zone systems are inefficient because they often run both heating and cooling at the same time, with a damper system controlling the amount of hot or