Case Study
4.5 MWe Refuse Derived Fuel to Energy Plant
email: info@biomasspower.co.uk web: www.biomasspower.co.uk Case Study 4.5 MWe Refuse Derived Fuel to Energy Plant This 4.5 MWe Biomass Power Plant is one of the turnkey products of Biomass Power. The plant has a capacity of 24 MW thermal and rated at 4.5 MWe producing 35,476MWh of green electricity per year, 100% of which is exported to the grid. The fuel used is segregated biomass from a commercial and industrial waste collection business.