Case Study

3300 South & I-215 Bridge

3300 South & I-215 Bridge

3300 South & I-215 Bridge •Salt Lake City, UT • Summer 2008 • Geofoam Structural Fill & Soil Stabilization • 24,200 Cubic Feet Engineer Rick Chestnut Terracon Engineering Contractor Bryan Jensen Ralph Wadsworth Construction 3300 South & I-215 Bridge Geof oam Application 24,200 cubic feet of EPS 22 Geofoam was used to reduce settlement on underlying soils and lateral pressure on the structural wall supporting the 3300 South & I-215 Bridge in

Join for free to read