Empire Pass • Deer Valley Resort, UT • Winter 2006 • Geofoam Bridge Approach Fill • 17,500 Cubic Feet Engineer Matt Perkins Lochner Contractor Mason Mitchel Granite Construction Empire Pass Geof oam Application 17,500 cubic feet of EPS 29 Geofoam was installed as bridge approach fill at the Deer Valley Resort in Empire Pass, Utah. Project Details Winter 2006, contractors installed EPS Geofoam as bridge approach fill