Case Study
1.6 MW power solution for telecom company’s Baghdad data centre
Prime Power Case History Asiacell Al-Masbah Data Centre Where: Baghdad, Iraq What: Four C550 D5e enclosed generator sets with QSX15 engines in parallel configuration, with LV switchgear, DMC1000 control, ATS GTEC 1600 Amps with bypass, fuel system, power and control cables, and a SCADA (Supervisory Control And Data Acquisition) system. Purpose: Prime power for data centre 1.6 MW power solution for telecom company’s Baghdad data centre