Case Study
1500 ACE Inlet At Bakewell
Rev 1 - 27/10/2009 CASE STUDY 1500 ACE Inlet at Bakewell STW SEPTEMBER 2009 SPECIFICATION Duty/Standby ACE Bandscreeners, ACE Bandgritter, Distribution Tank, ACE Package, Flow Control, Access / Gantry, MCC Controls all prefabricated, pre wired and pre tested to 150 l/s in the factory prior to delivery INSTALLATION Delivered to site as a complete unit ready to be connected, saving