144 mw Delimara D iesel power plant malta

144 mw Delimara D iesel power plant malta

Pages 6 Pages

Your Global Energy Partner Burmeister & Wain Scandinavian Contractor A/S 144 mw Delimara Diesel power plant malta Commissione D in 2012 Burmeister & Wain Scandinavian Contractor A/Sproje Ct ba Ckgroun D p lant Des Cription In 2012, Burmeister & Wain Scandinavian Contractor A/S (BWSC) completed the design, construction and commissioning of a 144 MWe diesel engine-based power plant for Enemalta Corporation (Enemalta) on Malta. The plant is located on Enemalta’s Delimara site and is to replace older generation units in another power station on the island. The new 144 MW Delimara Diesel Power Plant was from the outset required to comply with stringent environ- mental standards, while also providing reliable, flexible and cost efficient electrical power. On top of these challenges, the