Case Study

10,000 HP Compressor Station, Brazil

10,000 HP Compressor Station, Brazil

Pages 1 Pages

The Single Source PROJECT OVERVIEW AND CHALLENGES The customer required a single-source solution to minimize organizational and administrative complications. Enerflex designed and built a pipeline booster station to deliver gas for a large power generating facility in Brazil. The booster station, including six 7044 compressor packages, had to be installed in a remote rural area, with limited access to the site. UNIT LOCATION São Bras do Suaçuí

Join for free to read