Case Study
10 % Efficiency Increase: Classification Is One Of The Keys
Project Data The Production Line Condat PM8 online coating Max. inspection width: 5,500 mm Max. inspection speed: 1,050 m/min Annual output: 220,000 t/a The Inspection Infrastructure espresso by ISRA PARSYTEC 1 Transmission System at the PM8 before pre-coating 1 Transmission System with one frame before and one frame after the coater 1 Reflection System at the coater Value creation at Condat by ISRA PARSYTEC Web breaks reduced from 6 to 2 per d