Case Study

Zorinsky Federal Building Waffle Slab Strengthening

Zorinsky Federal Building Waffle Slab Strengthening

Pages 1 Pages

© 2016 Fibrwrap. Zorinsky Federal Building Waffle Slab Strengthening The Zorinsky Federal Building recently underwent a major renovation that included the removal of the center bay on a seven bay continuous waffle slab system to create an open atrium area. The removal of the center bay on two floors meant the demands on the waffle slab sections had to be redistributed. Thus, mid-spans became end-spans next to the new open bay and flexural s

Join for free to read