ZF Steering 15 Spiral Drive Florence, KY 41042 Project Type: Design Build HVAC for two new building built simultaneously. On-going HVAC Service Support. Impact: Better performing systems and savings . Project Reference Background : The project consisted of the construction of two new buildings on the same property, being built simulta- neously. The property is adjacent to the Greater Cincinnati International Airport. Close coordination with the Airport was necessary with regard to all crane / rigging activities. Close design coordination with each of the MEP Trades, along with ZF Steering representatives from Germany and the General Contractor was conducted over a 3 month period to finalize all of the specific HVAC, Process, Electrical, and Plumbing re- quirements. T