Case Study

Zero Maintenance

Zero Maintenance

Pages 2 Pages

The Challenge During the last decade we have introduced a variety of LED signals that provide a long and reliable operational service. The very low failure rates (over 40 million fault free operational hours for GPLs) and slow degradation of the LED intensity, allowed our design engineers to consider how to design the next generation of signals. The next challenge was to enable the industry to benefit from the signal performance and redu

Join for free to read