Case Study
Yorkshire Building Society raises efficiency with hosted desktops
Case Study Objective Simplify desktop infrastructure deployment and support for 500 headquarters staff Approach Deploy HPE Moonshot for Hosted Desktops to run Microsoft® System Center Configuration Manager and Microsoft Windows® 7 desktops IT Matters • Lowered power consumption from approximately 50 watts per desktop image to just 12.5 watts • Reduced the hosted desktop infrastructure footprint by more than 50 percent • Saves £111,000 in IT and power costs over a five year period • Delivers a platform that can be integrated into any future desktop strategy Business Matters • Enhances end-user productivity with predictable, reliable desktop performance • Improves operational efficiency • Removes pressure on property space caused by existing PC Jenga solution and provi