Case Study
York University Glendon Campus Cafeteria: Drain System Rehabilitation
Location: Toronto, Canada Situation: The cafeteria’s 24-year-old 4" cast iron dishwasher drain pipe system experienced severe corrosion, leaks and low flow from heavy scale build-up throughout the years. The customer was sick of the pipe system failures but did not want the mess and disruption from a re-pipe. Solution: Nu Flow’s “high temperature” epoxy accommodated the 140-degrees dishwasher water. Our patented Pull-in-Place structural liner was installed using existing access points, which prevented the need to dig up the kitchen. This liner protects the drain lines from future failures, including leaks. Where life interacts with infrastructure. North America: 1-800-834-9597 | International: 1-905-433-5510 info@nuflowtech.com | www.nuflowtech.com p/n 521 v1 York University Glen